10
STEP 9:
A: Fix 2 bolts (C) into the upper bolt hole of right cart frame and leave 5mm space for hanging the right side shelf for
side burner (14) ((C) Bolt 2Pcs).
B: Hang the right side shelf for side burner (14) onto 2 upper bolt heads.
C: Fix another 3 bolts (C) into the remaining bolt hole of right cart frame. ((C) Bolt 3Pcs).
D: Tighten all 5 bolts (C) securely on the right cart frame.
Note: Do not fully tighten the bolts until all 5 bolts are in place.
5
m
m
(C)
(C)
(C)
(14)
a
b
c
d
e
f
(C)
(C)
(C)
(C)
(C)
(C)