IPC-307
Inverter Phase Checker
Warning:ImportantInformation;readinstructions
ConformstoEuropeanUniondirectives
DirectCurrent
AlternatingCurrent
Warning:HazardousVoltages
DoubleInsulated
General specifications
Model:
Input Voltage: 3 phase to phase inputs L1, L2 & L3 : 440 V
AC max. 600V DC max
DC BUS Voltage: 280 - 600V DC
Phase load: 8.5 mA maximum per phase.
Carrier Frequency: 5 to 20Khz.
Operating Environment: 0 °C to 40 °C at < 80 % R.H.
Indoor and dry outdoor. IP40. Altitude: 2000 m (6561 ft.)
max.
Power: 2 x 1.5V LR6, AA Alkaline Battery Only.
Dimensions: Enclosure 119(L) x 79(W) x 24(D) mm.
Connection Leads: 500mm, 4mm shrouded banana
connectors.
Weight: 250g (with standard probes).
Overload protection 500V ac 10 seconds.
CAT II, 600V, Pollution degree 2, Class 2.
This meter meets CAT II IEC 61010 standards. The IEC 61010 safety
standard defines four measurement categories (CAT I to IV) based
on the magnitude of danger from transient impulses. CAT II meters
are designed to protect against transients in energy consuming
equipment supplied from fixed installation.
ThisGuidecontainsinstructionsforusingtheInverterPhaseChecker.Refertothemanufacturer’sservicemanual
oftheairconditioningequipmentforfurthersafetyandservicinginformation.
Safety
Warning.ReadbeforeusingtheIPC-307
Warningidentifieshazardousconditionsandactionsthatcouldcausebodilyharmordeath.
TheIPC-307isintendedtobeusedonlyonairconditioning,heat-pumpandrefrigerationbasedinvertersystemsonly.
Donotconnecttopowerdistributionorsupplylines(U,V,W).
UseonlyasspecifiedinthismanualortheprotectionprovidedbytheIPCmightbeimpaired.
Inordertoobtainacorrectdiagnosis,testsmustbemadeonelectricallyliveparts.Suchmeasurementsmustbemade
byproperlytrainedprofessionalpersons,familiarwiththehazardsinvolved.
Whenusingthetestleads,keepyourfingersbehindthefingerguards.
Donotallowconductorsofprobestocomeintocontactwithothercomponentsoranypartofthecaseormetalparts.
Donotmakeordisconnectcircuitswhilelive. Thisisdangerousandmaycausepermanentdamagetocomponents.
TheIPChasastrongmagneticbaseformountingconvenientlyontosteelcondenserhousings. Theengineermustbe
surethemountingissecurebeforepoweringup.
ProtecttheInverterCheckeragainstwater,moisture,condensationandprecipitation.
IftheIPCorconnectingleadsaredamaged,theymustbereplaced.
Donotapplymorethantheratedvoltage,asmarkedontheIPC.
Noserviceablepartsinside.DonotopentheIPCCasing.Operateonlywithbatterycoverfitted.
LimitthetimetheIPCisconnectedtooutputsofcontinuousactivityto10minutes.Restfor10minutesbeforerepeat
test.
n
n
n
n
n
n
n
n
n
n
n
n
n
Servicing and Cleaning
Accessaries
Part Number Description
Wipe the case with a damp cloth and mild detergent. Do not use abrasives or solvents. Dirt or moisture in the
terminals can affect safe use and correct functioning.
If the IPC or connecting leads are damaged, then the IPC will need to be replaced.
Verify the IPC operation by momentarily connecting a known 230VAC voltage to each combination of phase pairs
until, all 6 Indicators have been illuminated.
The battery can be tested by holding the MEM button for 4 seconds: If 6 LEDs light, then the batteries are good.
Use only alkaline batteries.
If storing for long periods remove batteries - in case of leakage.
IP 01-1020 Set of 3 Crocodile Clips.
IP 01-1030 Set of 3 Retractable Hook Probes.
IP 01-1040 Set of 3 Insulation Piercing Probes.
Technical Assistance
info@mpsaet.com, www.mpsaet.com
MPS ADVANCE ELECTRONIC TECHNOLOGY, S.L. Urb. La Vista C/ Trébol, 4-6, E-29639 Benalmádena (Málaga)
España. Tel: + 34 952 56 56 88,