EasyManua.ls Logo

mr. steam CU-2500 User Manual

Default Icon
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
1
mr
.
steam
®
Feel Good Inc.
CU Series Steambath Generators
Installation, Operation & Maintenance Manual Models: CU-360 through CU-4500
Installation, Operation & Maintenance Manual
_______________________________________
I
M
PORTA
N
T:
L
EA
VE
T
HI
S
M
A
N
U
A
L
WI
T
H T
HE
OWN
ER
/OPER
A
T
OR
_______________________________________
Question and Answer IconNeed help?

Do you have a question about the mr. steam CU-2500 and is the answer not in the manual?

mr. steam CU-2500 Specifications

General IconGeneral
Brandmr. steam
ModelCU-2500
CategoryPortable Generator
LanguageEnglish

Summary

Installation Preparation Guidelines

Product Modification Warning

Warning against altering or modifying products.

Steam Generator Unit Location

Installation Location Requirements

Indoor, dry, clean location, away from flammables.

Steam Head Placement Guidelines

Locate steam heads away from seating and traffic.

Selecting the Correct Steam Generator

Determining Steam Room Volume

Multiply Length x Width x Height to find volume.

Generator Sizing and Selection Guidelines

Consult architect/designer; select next larger volume.

Installation Clearance Specifications

CU360-1400 Clearance Requirements

Specifies minimum clearances for installation and servicing.

CU2000 & CU3000 Clearance Requirements

Specifies minimum clearances for installation and servicing.

Installation Clearance Specifications (Continued)

CU4500 Clearance Requirements

Specifies minimum clearances for installation and servicing.

Installation Procedures

Plumbing Requirements

Performed by qualified plumber, follow codes.

Water Supply Connection Guidelines

Connect to water line, install shut-off, check pressure.

Steam Line Installation Requirements

Use brass/copper, pitch line, insulate.

Water Quality Recommendations

Recommended Feedwater Quality

Lists recommended limits for hardness, alkalinity, pH.

Steam Room Component Details

Steamhead Installation and Shielding

Install steamhead 12-30 inches above floor, use acrylic shield.

Electrical Installation and Safety

Electrical Safety Precautions

Disconnect power, use qualified electrician, follow codes.

Wiring and Connection Requirements

Use proper conductors, grounding, and dedicated circuits.

Wiring Diagrams and Standards

Wiring Standards and Diagrams

Follow National/local codes and wiring diagrams.

Safety Switch and Breaker Installation

Install safety switch with adequate capacity breakers/fuses.

Control Circuit Wiring Overview

Control Circuit Safety and Notes

Safety switch, room requirements, sensor placement.

Digital 1 Temperature Control System

Digital 1 system is required; set temperature at owner's discretion.

Control Circuit Wiring for CU 2000+ Models

Sensor Installation and Timer Settings

Sensor placement and timer/control settings are owner's discretion.

Digital 1 Control Panel Installation

Control Panel Mounting and Wiring

Mount the Digital 1 control panel and connect control wires.

Temperature Sensor Installation

Locate sensor 5 ft above floor, away from steam heads.

Generator Principles of Operation

Temperature and Pressure Control

Digital 1 controls temp; pressure controls maintain set pressure.

Automatic Blowdown System CU 81600

Automatic Blowdown Kit Installation

Instructions for installing the automatic blowdown kit and programming.

Automatic Blowdown Operation and Testing

Blowdown System Testing Procedure

Step-by-step procedure to test the blowdown system.

Setting Operating Temperature

How to set the operating temperature on the Digital 1 control.

Operation Indicators and Timers

Error and Message Displays

Lists possible messages and their meanings.

30 Minute Room Timer Installation

Safe installation of the 30-minute timer.

Pre-Operation and Safety Checks

Health and Safety Warnings

Warnings about overheating, scalding, slipping, and signage placement.

Pre-Operation Checks

Checks for water supply, switches, and LWCO operation.

Generator Operation

Water Gauge and Glass Installation

24-Hour and 7-Day Time Switches

Troubleshooting Common Issues

No Water or Heating Issues

Common causes and remedies for no water or heating issues.

Troubleshooting Guide

General Troubleshooting Steps

General steps for troubleshooting, including voltage checks and override switch.

Troubleshooting Guide (Continued)

Component Checks and Testing

Element Replacement Instructions

Related product manuals