EasyManua.ls Logo

MSI P55A-G55 series - Page 22

MSI P55A-G55 series
102 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2-6
Hardware Setup
MS-7668
Chapter 2
Hardware Setup
MS-7668
Chapter 2
Visually inspect if the CPU is seated
well into the socket. If not, take out
the CPU with pure vertical motion
and reinstall.
5.
Engage the load lever while pressing
down lightly onto the load plate.
6.
Secure the lever near the hook end
under the retention tab.
7. Make sure the four hooks are in por-
per position before you install the
cooler.
8.
Important
Con󰘰rm if your CPU cooler is 󰘰rmly installed before turning on your system.
Do not touch the CPU socket pins to avoid damaging.
Alignment Key

Related product manuals