MTZ 1220.1/1220.3 Section М. Possible failures
М12
tom cover, outlet holes in cover are
littered.
gap availability.
through air takeoff valve
Rod of air takeoff valve in regulator of pres-
sure is insufficiently sunk.
Screw a nut on
Regulator of pressure switched compressor
Reduce pressure in balloon below 0,65 MP
(6,5 kilogram-force /sm
2
).
Displacement of rubber ring on air takeoff
Turn off cover, check position and condition
Brakes of trailer are released slowly
Adjustment of brake valve and its drive is
disturbed.
Adjust. (see section “Adjustments”).
Work of trailer brake system is disturbed. Adjust.
Brakes of trailer operate ineff
Brake valve does not provide pressure
0,77…0,80 MP (7,7…8,0 kilogram-
/sm
2
) in main pipe.
Adjust brake valve and its drive (see sec
“Adjustments”).
Brake valve does not provide pressure drop
to zero in connecting pipe.
Adjust brake valve and its drive (see sec
“Adjustments”).
Pressure in connecting pipe slowly drops to
zero.
Check condition of connecting pipe, atmos-
pheric valve hole, brake pedal stroke.
Work of trailer brake system of is disturbed. Adjust.