2 of 17
Copyright 2014 ▪ Nanalysis Corporation
• Safely un-crating the instrument
• Parts Checklist
• Requirements for choosing a site to locate instrument
• Operating recommendations
• Network requirements
• Powering up the instrument
• Site adjustments
• Solvent reference tubes and solvent management
• Broken tube removal
• Shipping the instrument
• The Sample Warmer
What’s in this guide