8 2-Bag Bagwell Upgrade
3. Disconnect the following cables:
• USB Power Cable from the Scale Controller
• Local Area Network (LAN) Cable from the Customer Interface
• ACPower Out Cables from the Power Strip
• AC Power In Cable from the Power Strip
Note: Remove cables from any routing clips or tie wraps if needed.