EasyManua.ls Logo

NEO Spring - Filter Replacement Cycle; Problem Analysis and Solutions

NEO Spring
12 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
1.Closemainwatersupplyvalvetoseparatethefaucet.
2.WindtheTeontapeontheadaptorandtittothepipe.
Do not turn the water pipe.
3.Connectthefaucetwiththeadaptor.
Shall install the adaptor with connector on the cold water
pipe.
4.Connect1/4inchwhitetubingwiththeconnectoronthe
adaptor.
Flush water through each lter at least 5 minutes before
Connecon.
Packing List
RO machine 1set
TFC RO membrane 1piece
Accessory BallValve,GateValve,Spanner,TeonTape
Tubing (1/4”) 5 m
Warranty Card 1nos.
Manual 1piece
Pre Filter Housing Set 1piece
6