Steps
1. Use the animation or the tabulated steps to complete the cabling between the controllers and the switches:
Animation - Cable a two-node switchless cluster
Step Perform on each controller module
Cable the HA interconnect ports:
• e0b to e0b
•
e1b to e1b
Cable the cluster interconnect ports:
• e0a to e0a
•
e1a to e1a