EasyManua.ls Logo

NetApp AFF A150 - Page 582

NetApp AFF A150
808 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Steps
1. Use the animation or the tabulated steps to complete the cabling between the controllers and the switches:
Animation - Cable a two-node switchless cluster
Step Perform on each controller module
Cable the HA interconnect ports:
e0b to e0b
e1b to e1b
Cable the cluster interconnect ports:
e0a to e0a
e1a to e1a
580

Other manuals for NetApp AFF A150

Related product manuals