You need to be aware of the safety concerns associated with the weight of the system.
3. Attach cable management devices (as shown).
4. Place the bezel on the front of the system.
Step 3: Cable controllers to your network
You can cable the controllers to your network by using the two-node switchless cluster
method or by using the cluster interconnect network.
Option 1: Two-node switchless cluster
Management network, data network, and management ports on the controllers are
connected to switches. The cluster interconnect ports are cabled on both controllers.
Before you begin
You must have contacted your network administrator for information about connecting the system to the
switches.
Be sure to check the direction of the cable pull-tabs when inserting the cables in the ports. Cable pull-tabs are
up for all networking module ports.