EasyManua.ls Logo

NetApp AFF - Page 32

NetApp AFF
1152 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
If the
Key Manager type = external and the Restored column = anything other than yes/true,
use the
security key-manager external restore command to restore the key IDs of the
authentication keys.
If the command fails, contact Customer Support.
If the
Key Manager type = onboard and the Restored column = anything other than yes/true,
use the
security key-manager onboard sync command to re-sync the Key Manager type.
Use the
security key-manager key query command to verify that the Restored column =
yes/true for all authentication keys.
11. Connect the console cable to the partner controller.
12.
Give back the controller using the
storage failover giveback -fromnode local command.
13.
Restore automatic giveback if you disabled it by using the
storage failover modify -node local
-auto-giveback true
command.
Return the failed part to NetApp - AFF C190
After you replace the part, you can return the failed part to NetApp, as described in the
RMA instructions shipped with the kit. Contact technical support at
NetApp Support, 888-
463-8277 (North America), 00-800-44-638277 (Europe), or +800-800-80-800
(Asia/Pacific) if you need the RMA number or additional help with the replacement
procedure.
Chassis
Overview of chassis replacement - AFF C190
To replace the chassis, you must move the power supplies, hard drives, and controller
module or modules from the impaired chassis to the new chassis, and swap out the
impaired chassis from the equipment rack or system cabinet with the new chassis of the
same model as the impaired chassis.
All other components in the system must be functioning properly; if not, you must contact technical support.
You can use this procedure with all versions of ONTAP supported by your system.
This procedure is written with the assumption that you are moving all drives and controller module or
modules to the new chassis, and that the chassis is a new component from NetApp.
This procedure is disruptive. For a two-node cluster, you will have a complete service outage and a partial
outage in a multi-node cluster.
Shut down the controllers - AFF C190
You must shut down the controller or controller in the chassis prior to moving them to the
new chassis.
About this task
If you have a cluster with more than two controllers, it must be in quorum. If the cluster is not in quorum or
30

Related product manuals