c.
If necessary, modify the date with the
set date mm/dd/yyyy command.
d.
If necessary, set the time, in GMT, using the
set time hh:mm:ss command.
e. Confirm the date and time on the target controller.
7.
At the LOADER prompt, enter
bye to reinitialize the PCIe cards and other components and let the
controller reboot.
8.
Return the controller to normal operation by giving back its storage:
storage failover giveback
-ofnode impaired_node_name
9.
If automatic giveback was disabled, reenable it:
storage failover modify -node local -auto
-giveback true
Step 5: Complete the replacement process
After you replace the part, you can return the failed part to NetApp, as described in the RMA instructions
shipped with the kit. Contact technical support at
NetApp Support, 888-463-8277 (North America), 00-800-44-
638277 (Europe), or +800-800-80-800 (Asia/Pacific) if you need the RMA number or additional help with the
replacement procedure.
AFF A200 System Documentation
Install and setup
Cluster configuration worksheet - AFF A200
You can use the
Cluster Configuration Worksheet to gather and record your site-specific IP addresses and
other information required when configuring an ONTAP cluster.
Start here: Choose your installation and setup experience
You can choose from different content formats to guide you through installing and setting
up your new storage system.
•
Quick steps
A printable PDF of step-by-step instructions with live links to additional content.
•
Video steps
Video step-by-step instructions.
Installation and setup PDF poster - AFF A200
You can use the AFF A200 Installation and Setup Instructions poster to install and set up your new system.
The PDF poster provides step-by-step instructions with live links to additional content.
Installation and setup video - AFF A200
The
AFF A200 Setup Video shows end-to-end software configuration for systems running ONTAP 9.2.
80