Inspection of the installation
Current regulations require the heating installation to be inspected before it is commissioned. The inspection must be
carried out by a suitably qualified person. In addition, fill in the page for the installation data in the User Manual.
DateSignatureNotesDescription
Electricity (page 12)
Connections
Main voltage
Fuses property
Earth circuit-breaker
5Chapter 1 | Important informationNIBE ERS 20-300