1) Cage/Platform
2) Cage Controls
3) Ground Controls – Buttons
4) Ground Controls - Levers
5) Lower Boom
6) Upper Boom
7) Cage/Ground Selector
8) Manual Hand Pump
9) Mains Power Input
Ground Controls
Nifty HR12
Ground Control Levers Cage Control Levers
Cage Controls
Cage
Overload
Lower
Boom
Upper
Boom
Slew Lower
Boom
Tele
Boom
Cage
Levelling
Upper
Boom
SlewDrive/
Steer
Push and hold green power button
Select lever for desired boom function
Cage Overload
Emergency Stop
Green (Power)
Keyswitch
Emergency
Stop Horn
Keyswitch
Tilt Warning
Green
(Power)
Hi/Low
Drive
Battery
Meter
Question and Answer IconNeed help?

Do you have a question about the nifty HR12 and is the answer not in the manual?

Summary

Daily Safety Checks

Labels and Manuals Verification

Confirm all labels, placards, and the operating safety manual are present and legible.

Machine Structure Inspection

Check chassis, booms, platform, welds, guards, and wheels for damage or missing components.

Warnings and Switches Check

Inspect platform load sensor, tilt sensor, alarm horn, and various switches for functionality.

Controls Functionality Test

Verify all operating, emergency, and manual descent controls function correctly.

Hoses and Wiring Inspection

Check hydraulic, fuel, air systems, and electrical cables for damage or leaks.

Power Systems Assessment

Examine batteries, engine oil, and coolant for condition and correct fluid levels.

Personal Protective Equipment (PPE)

Ensure safety harnesses, lanyards, and hard hats are in good condition and fit for purpose.

Ground and Platform Controls Operation

Pre-Operation Area Check

Inspect the area around the platform for obstructions or hazards before operation.

Control Station Setup

Ensure emergency stops are out and set key switch and selector valve correctly.

Initiating Boom Functions

Push the green power button and select the desired boom function.

Post-Operation Procedures

Stow the machine, turn off the key switch, remove the key, and chock wheels.

Driving Controls and Operation

Driving Site and Route Checks

Check proposed route for possible hazards, obstructions, and personnel.

Drive Activation and Speed

Use the drive speed selector for High or Low gradeability.

Joystick Operation

Operate the drive joystick for forward, reverse, and steering functions.

Slope Operation and Tilt Alarm

Understand slope limits and tilt alarm activation during operation.

Emergency Controls and Procedures

Incapacitated Operator

Use ground controls to manoeuvre the machine if the operator is incapacitated.

Machine Failure Recovery

Use the Manual Hand Pump for hydraulic power to manoeuvre the machine.

Cage Overload Recovery

Recover machine using Manual Hand Pump if cage contacts an object.

Post-Emergency Descent Checks

Extend and retract all cylinders from ground control after emergency descent.

Operational Safety Guidelines

Operator Training and Understanding

Ensure operators read and understand the relevant operating and safety manual.

Pre-Use Inspection and Testing

Perform visual and functional tests before each day and shift.

Safety Component Integrity

Repair any malfunctions affecting operational safety before further use.

Hazardous Area Checks

Check the work area for hazards like uneven ground, obstructions, and weather.

Electrical Clearance

Maintain a minimum 4.0m clearance from electrical power lines.

Platform Usage Rules

Remain standing within the platform; do not climb on guardrails or use aids.

Load and Wind Considerations

Do not lift overhanging items or objects that increase wind loading.

Important Safety Precautions

Cage Step Clearance

Elevate booms 250mm before slewing and check clearance during lowering.

Prohibited Activities

Stunt driving, horseplay, and using the Niftylift as a crane are prohibited.

Hazardous Atmospheres

Determine hazard classification of location; use approved aerial platforms if required.

Reporting Malfunctions

Report any suspected malfunctions or unsafe conditions immediately.

Battery Charging Safety

Charge batteries in a well-ventilated area, free from sparks or flame.

Fuel Handling Safety

Shut down engine when filling fuel tanks; never start if fuel odour is detected.

Unauthorized Use Prevention

Implement means to protect against use by unauthorized persons.