Do you have a question about the NorAire NC-FE series and is the answer not in the manual?
Highlights key installation steps and attention points.
Explains the IDU's control mechanism via external and internal devices.
Details electrical specs for the IDU's control and internal pump.
Lists electrical specifications for the internal backup boiler.
Explains how to connect the IDU to the building's power supply.
Directs users to ODU manual for power source connection details.
Describes thermostat and buffer tank controller connection requirements.
Outlines low voltage wiring between IDU and ODU control.
Provides recommendations and configuration notes for the BTC.
Explains how to match reversing valve logic to the ODU.
Details the function and connection of the utility interrupt feature.
Describes the use of Form C contacts for boiler shutoff valve relay.
Specifies configuration for forced air water coil heating with specific kits.
Details backup configuration requirements for external boilers or furnaces.
Explains the RV logic jumper setting on the controller board.
Describes the rotary dial switch for system configuration modes.
Notes jumper removal and mode setting for BTC connection.
Explains how outdoor temperature affects boiler backup operation.
Guides on using software for defaults, monitoring, and configuration.
Mentions PC setup determines utility interrupt action.
Describes the meaning of front panel indicator lights like POWER ON, STATUS, ALARM.
Details the indicator lights on the controller's back panel.
Explains how external thermostats control heating and cooling functions.
Refers users to other sections for programming and accessory information.
Discusses system design, sizing, and the importance of proper operation.
Outlines six key factors influencing the control sequence analysis.
Covers internal system checks like ACD, pump operation, and backup modes.
Lists pre-startup verification steps for piping, electrical, and controls.
Explains the use of diagnostic software for monitoring and configuration.
Describes the software feature for real-time temperature sensor monitoring.
Details how to access and interpret the system's service and alarm logs.
Guides on understanding and managing factory default settings.
Explains how to measure and calculate water flow rates for system performance.
Advises on verifying refrigerant charge and pressures as per ODU manual.
Explains how control sequences are affected by field setup and conditions.
Suggests checking key voltage points for diagnostic purposes.
Refers to the control sequence section for information on ACD.
Highlights the diagnostic value of the software for changing delay times.
Warns about the difficulty of testing the board without external sensors.
Explains how different sensors are used in sequence calculations.
Describes LED indications for detected sensor faults.
Notes that these sequence calculations can be disabled via PC setup.
Details the HP-BTC controller and its features.
Lists various zone controller models and their capabilities.
Presents available chilled water coil options with specifications.
Specifies the 20-year warranty for boiler elements and vessels.
Details the 20-year warranty coverage for spin fin elements.
Covers the 5-year warranty for open wire elements.