EasyManua.ls Logo

nord SK 7207 - Retrospective Paintwork

nord SK 7207
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3. Storage, Transport,
Preparation, Installation
-20- B1050-GB-0213 www.nord.com
Attention!
With circulation lubrication (LC) use the connection diagram included by NORD.
Figure 3-13: Industrial gear unit with CS1 and CS2 cooling systems
Figure 3-14: Hydraulic diagram of the industrial gear unit with CS1 and CS2 cooling systems
3.14 Retrospective paintwork
Attention!
For retrospective painting of the gear unit, the radial seals, rubber elements, pressure venting
valves, hoses, type plates, adhesive labels and motor coupling components must not come
into contact with paints, lacquers or solvents, as otherwise components may be damaged or
made illegible.
(1) Gear unit intake connection
(2) Pump / cooling system intake connection
(3) Cooling system pressure connection
(4) Gear unit pressure connection
(
5
)
Tem
p
erature monitorin
g
(
o
p
tional
)

Related product manuals