Start Up | 28
RH2 Pre-Start Up Checklist
Unit Serial #: _________________ No. of humidifiers: _______ Tag: _______________
Unit type: _______ __________ Voltage: ________V/_____ph
Cylinder type: Customer/Job: Address:
WATER QUALITY:
Well water City water Softened water
HUMIDIFIER MOUNTING:
Level • Front Clearance 36 in.
STEAM LINE(S):
Material • Diameter / Size
Slope up (min 2 in/ft) • Slope down (min 0.500 in/ft)
Low point condensate traps • No hose kinks / Restrictions
Minimum 1 inch insulation
CONDENSATE LINE(S):
P Trap min 6 in or duct press + 2in • P Trap min 12 in drop
WATER LINE:
1/2 in to within 4ft of unit • Water pressure: 30-80 psig
Cold water source (34-68ºF/1-20ºC)
DRAIN LINE:
Air gap within 3 ft of the unit • Diameter / Size
CYLINDER:
Seated in drain valve yes no
Torque for gear clamp of cylinder steam exit to steam line (max 12 in•lbs): ______________
WIRING:
Wiring connections and connectors secured yes no
CONTROLS:
On / Off / Security loop devices working correctly yes no
Jumper J10 set to
Modulating (removed)
Or
On/Off (installed)
Control Location
High Limit Location
POWER:
Voltage, amp, fuse per Spec Label: yes no
Disconnect switch located close to humidifier yes no
Panel Number
Inspected by: Date of inspection: ______/_______/______
Company: