EasyManua.ls Logo

NuAire LabGard D NU-543-400 User Manual

NuAire LabGard D NU-543-400
70 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
OM0283 Page 1 of 70
LabGard® ES Energy Saver
Class II, Type A2 Laminar Flow
Biosafety Cabinet
Models
NU-543-300/400/500/600
Bench/Console
Operation and Maintenance Manual
July, 2021
Revision 2
NU-543-300 Series E
Nu-543-400/500/600 Series D
Manufactured By:
NuAire, Inc.
2100 Fernbrook Lane
Plymouth, MN 55447
Toll-Free: 1-800-328-3352
In Minnesota: (763)-553-1270
Fax: (763)-553-0459
Question and Answer IconNeed help?

Do you have a question about the NuAire LabGard D NU-543-400 and is the answer not in the manual?

NuAire LabGard D NU-543-400 Specifications

General IconGeneral
BrandNuAire
ModelLabGard D NU-543-400
CategoryLaboratory Equipment
LanguageEnglish

Summary

General Information

Safety Instructions

Outlines essential safety guidelines for operating the biosafety cabinet.

Installation Instructions

Set-Up Procedures

Guides through the steps for assembling and preparing the cabinet for use.

Testing Methods and Equipment

Outlines procedures for testing and commissioning the biosafety cabinet.

Operating the NU-543 Biosafety Cabinet

FlowGard™ Control System Overview

Explains the electronic control system for managing cabinet functions and airflow.

Front Panel Controls and Indicators

Describes the controls and indicators on the cabinet's front panel.

Operating Guidelines and Techniques

Employing Aseptic Technique

Stresses the necessity of aseptic techniques for effective cabinet use and containment.

Operating Sequence and Procedures

Hazardous Drug Decontamination

Provides procedures for decontaminating the cabinet after handling hazardous drugs.

General Maintenance and Decontamination

Manual Decontamination Procedure

Step-by-step guide for manually decontaminating the biosafety cabinet.

Automatic Decontamination Process

Describes the use of automated systems for cabinet decontamination.

Lamp Replacement and Filter Maintenance

HEPA Filter Removal and Replacement

Detailed steps for removing and installing HEPA filters.

System Setup and Calibration

Airflow Control System Setup

Procedures for configuring and calibrating the airflow control system.

Setpoint Parameters Configuration

Defines and adjusts airflow setpoints and alarm limits for optimal performance.

Airflow Calibration Procedures

Downflow Airflow Calibration

Steps to calibrate the downflow air velocity within the cabinet.

Inflow Airflow Calibration

Steps to calibrate the inflow air velocity according to specifications.

Filter Integrity Testing

HEPA Filter Leak Test

Procedure for checking the integrity of HEPA filter seals and media.

Control Board and Fuse Management

Main Control Board Replacement

Instructions for replacing the main control board assembly.

Error Messages and Troubleshooting

Error Message Troubleshooting Guide

Provides a table of error messages and their corresponding troubleshooting steps.

Automated Decontamination Configuration

Electrical and Environmental Requirements

Related product manuals