EasyManua.ls Logo

NuTone LS80L User Manual

NuTone LS80L
10 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
IMPORTANT SAFETY INSTRUCTIONS
WARNING: TO REDUCE THE RISK OF FIRE. ELECTRIC SHOCK,
OR INJURY TO PERSONS, OBSERVE THE FOLLOWING:
A. Use this unit only in the manner intended by the manufacturer.
If you have questions, contact the manufacturer.
B. Before servicing or cleaning unit, switch power off at service
panel and lock service panel to prevent power from being
switched on accidentally.
When the service disconnecting means cannot be locked, securely
fasten a prominent warning device, such as a tag, to the service panel.
CAUTION:
For general ventilating use only. Do not use to exhaust hazardous
or explosive materials and vapors.
INSTALLATION INSTRUCTIONS
WARNING: TO REDUCE THE RISK OF FIRE, ELECTRIC SHOCK,
OR INJURY TO PERSONS, OBSERVE THE FOLLOWING:
A. Installation work and electrical wiring must be done by qualified
person(s) in accordance with all applicable codes and standards, including fire-rated
construction.
B. Sufficient air is needed for proper combustion and exhausting of gases through the
flue (chimney) of fuel burning equipment to prevent back drafting. Follow the heating
equipment manufacturer's guideline and safety standards such as those published by
the National Fire Protection Association (NFPA),and the American Society for
Heating, Refrigeration and Air Conditioning Engineers (ASHRAE),
and the local code authorities.
C. When cutting or drilling into wall or ceiling, do not damage electrical wiring
and other hidden utilities.
D. Ducted fans must always be vented to the outdoors.
E. If this unit is to be installed over a tub or shower, it must be marked as appropriate for
the application and be connected to a GFCI (Ground Fault Circuit Interrupter)
protected branch circuit.
F. NEVER place a switch where it can be reached from a tub or shower.
Do not install in a ceiling insulated to a value greater than R40.
Suitable for use with solid state speed controls. Use NuTone Model VS-64.
Not for use in kitchens.
FOR BEST RESULTS
When installing the Ventilator in a new construction site, install housing during
the rough-in construction of the building. The blower unit and grille should be installed
after the finished ceiling is in place.
To install a ventilator in an existing building requires an accessible area (attic or
crawl space) above the planned location.
INSTALLATION IN A NEW CONSTRUCTION SITE
PREPARATION
1. Remove blower/power unit assembly from housing:
A. If necessary, unplug power unit.
B. Loosen one (1) mounting screw.
C. Slide unit back to free it from the mounting screw.
D. Remove unit and set aside until needed.
2. Remove wiring knockouts from housing, as needed.
INSTALLATION INSTRUCTIONS
READ & SAVE THESE INSTRUCTIONS!
Ultra-QuieTTest Fan/Lights
MODELS: LS80L, LS100L
SUITABLE FOR USE OVER TUB OR SHOWER ENCLOSURE
WHEN INSTALLED IN A GFCI PROTECTED BRANCH CIRCUIT.
FIGURE 1
ROOF CAP
4" DIAMETER DUCT
90° ELBOW
WALL CAP
FIGURE 2
GROUND
SCREW
120v AC SUPPLY
WHITE (NEUTRAL)
SWITCH BOX
CEILING INSTALLATION
FAN
RECEPTACLE
LAMP
RECEPTACLE
(3 PIN)
BLACK (HOT)
Question and Answer IconNeed help?

Do you have a question about the NuTone LS80L and is the answer not in the manual?

NuTone LS80L Specifications

General IconGeneral
BrandNuTone
ModelLS80L
CategoryFan
LanguageEnglish

Summary

Important Safety Instructions

General Safety Warnings

Observe warnings to reduce risk of fire, electric shock, or injury. Use unit as intended.

Ventilation Caution

Use for general ventilation only. Do not exhaust hazardous or explosive materials or vapors.

Installation Constraints

Specific limitations for installation including insulation, speed controls, and kitchen use.

Installation Instructions

Mandatory Installation Precautions

Follow warnings for fire, shock, injury. Ensure qualified personnel, proper combustion air, and code compliance.

Electrical and Ducting Guidelines

Avoid hidden utilities. Vent ducted fans outdoors. GFCI protection required for tub/shower installations.

Best Results Advice

Tips for installing housing during rough-in for new construction or locating for existing buildings.

New Construction Site Preparation

Steps for preparing housing, including removing blower/power unit and wiring knockouts.

Mounting the Housing

Housing Installation Steps

Secure mounting brackets to joists, position housing, and ensure flange is even with finished ceiling.

Ducting for Ventilation

Use 4" round duct to discharge ventilator to the outside. Avoid obstructions and insulation in ductwork.

Wiring and Power Unit Installation

Electrical Connections

Connect house power wiring to junction box, ensuring proper grounding of all components.

Power/Blower Unit Assembly

Plug motor into socket and slide unit forward to engage mounting screw securely.

Installation in Existing Construction

Location and Planning

Requires accessible attic/crawl space. Plan ducting and wiring, checking for obstructions.

Installation from Accessible Area Above

Drill small hole, locate, mark cutout using housing as template, and make cutout.

Grille/Light Installation and Lamp Replacement

Grille and Light Assembly

Install 100W lamp, depress springs to insert grille into housing, and connect reflector plug.

Lamp Replacement Procedure

Remove grille, disconnect plug, depress springs, replace lamp, and remount grille.

NuTone One Year Limited Warranty

Warranty Coverage and Limitations

Covers defects in materials/workmanship for one year. Excludes normal maintenance, misuse, and specific parts.

Obtaining Warranty Service

Contact NuTone with model number, part ID, defect description, and proof of purchase.

Parts List

Component Identification

List of parts with original part numbers, model applicability, and current replacement part numbers.

Related product manuals