EasyManua.ls Logo

Nyos TORQ User Manual

Default Icon
2 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
(Fig 1)
Removal position
Setting the flow rate
(Fig. 5)
NYOS
®
TORQ
®
QUICK START
Step 01 Positioning the TORQ
®
Dock in the sump
• In sump use only
• Avoid contact to side panes
• Only plug in, when the body is on the
dock
Full instructions and safety information
Video instructions and tips
Step 03 Insert TORQ
®
Body and start operation
1. Fit the body on the dock in the removal position
(Fig. 5)
2. Plug in the dock
3. It is possible to change the flow rate by rotating
the body.
4. Set the flow rate so that the filter media will be
hold in suspense
NOTE: A smear layer will form after a few days.
This will result in a quieter return flow and bubble
formation will reduce.
Manufactured by
Nyos
®
Aquatics GmbH,
Siemensstr. 26,
70825 Korntal-Muenchingen, Germany
www.nyos.info, info@nyos.info
EN
Question and Answer IconNeed help?

Do you have a question about the Nyos TORQ and is the answer not in the manual?

Nyos TORQ Specifications

General IconGeneral
BrandNyos
ModelTORQ
CategoryAquariums
LanguageEnglish

Summary

Insert TORQ Body and Start Operation

Fit TORQ Body to Dock

Position the TORQ® body onto the dock in the removal orientation.

Connect Power to Dock

Plug the TORQ® dock into the power supply.

Adjust Flow Rate

Set the desired flow rate by rotating the TORQ® body.

Optimize Filter Media Suspension

Adjust flow to ensure filter media remains suspended.

Positioning the TORQ Dock in the Sump

Sump Installation Guidelines

Follow specific guidelines for sump placement and operation.

Filling the TORQ Body

General Assembly Alignment

Ensure the groove and lug align correctly during assembly.

Filling with One Filter Media

Steps for adding one type of filter media.

Filling with Two Filter Media

Steps for adding two types of filter media.

Related product manuals