EasyManua.ls Logo

OBL X9 Series - Page 38

Default Icon
39 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
X9 Series metering pumps Operating manual
Page 38 Copyright © - OBL Metering pumps - All rights reserved File: UT-4336 – Rev.0
GB
Present information does not replace any existing standard or requirement for safety. OBL declines any
responsibility for damages to persons or property.
10.3 GOODS REJECTED TO SENDER
If OBL receives the goods:
- Not properly cleaned (and/or without declaration of conformity for shipping filled-in)
- PUMPS: With pumphead not properly dismantled and cleaned
- WITHOUT an RA number (authorisation number) on shipping documents and/or on the packing itself
- With chemicals in the packing
They WILL NOT be accepted (nor service will be done) and will be sent back at sender's expenses !
11. OVERALL AND SECTIONAL DRAWINGS
Considering the importance of such documents (subject to changes or updates) we belief that they should not be an integral part of the
present instructions manual. Unless agreed otherwise with the customer, they are therefore manually attached (latest edition).
12. CE CONFORMITY DECLARATION
L series version X9 hydraulic diaphragm metering pumps with positive return mechanism are comply to requirements of
following European Directives (latest edition):
- Machinery Directive
- Low Tension Directive
- Electromagnetic Compatibility Directive
The CE conformity declaration is an integral part of this operating manual (see next page).

Table of Contents

Related product manuals