Outdoor Living Today www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 19
14. Position assembled Ridge Board on top of King Stud. Fasten Ridge Board to King Stud with
2 - 2 1/2” Brown Screws per side.
Hardware:
- 4x 2 1/2” Brown Screws
15. Locate Gable Triangle Poly pieces. Slide Poly pieces into the dado of the King Stud and Door
Header. Complete for both sides.
Pieces:
- 4x Gable Triangle Poly
(1/4” x 12 13/16” x 5 3/16”)