EasyManua.ls Logo

OLT GH88 - Structural Finishing and Securing; Gusset and Wall Securing

Default Icon
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Outdoor Living Today www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 25
25. Locate remaining Door Header. This will be installed as a gusset underneath the Center
Rafters. Hold the Gusset up against the underside of the rafters, above the Vent Window Cleat and
fasten to Rafters with 2 - 2 1/2” Brown Screws per end.
Pieces:
- 1x Door Header
(3 1/2” x 3 1/2” x 38 1/2”)
Hardware:
- 4x 2 1/2” Brown Screws
26. Once again check diagonal measurements in your greenhouse to make sure it is square as
per Step 9. With the walls positioned correctly, screw each wall down into the foundation post with
3 - 2 1/2” Brown Screws per wall. Ensure walls are flush with Posts when tieing walls down.
Hardware:
- 39x 2 1/2” Brown Screws

Related product manuals