EasyManua.ls Logo

Omer Kar 350 User Manual

Omer Kar 350
45 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
OPERATION AND MAINTENANCE MANUAL
Mechanical Levelling
OMER NA Inc.
2300 Speers Road, Oakville, ON. L6L 2X8
Tel. 905-847-1198 Fax 905-891-1214
!
Kar 350
Capacity 35,000 Kg / 77,162 Lbs
Noiselevels 70dB (A)
Question and Answer IconNeed help?

Do you have a question about the Omer Kar 350 and is the answer not in the manual?

Omer Kar 350 Specifications

General IconGeneral
BrandOmer
ModelKar 350
CategoryLifting Systems
LanguageEnglish

Summary

General Information

Marketing Data

Details about the lift's specifications, including manufacturer and model identification.

Assistance

Contact information for technical support, service, and customer assistance.

Description of Personnel

Defines roles such as Operator, Specialized Technician, Exposed Person, User, and Maintenance.

Description of the Machine

Technical Data

Provides key specifications like lift capacity, motor power, electrical supply, and pressure ratings.

Nomenclature

Explains model codes and legends used for identifying different versions of the machine.

Loading Conditions

Details the maximum lift capacity and safe vehicle placement guidelines to prevent overloading.

Safety

Expected Use

Defines the intended function of the lift for motorized vehicles and proper usage scenarios.

General Safety Regulations

Outlines essential safety rules, manual accessibility, and user responsibilities for safe operation.

Precaution

Lists important precautions including not exceeding capacity, not lifting people, and authorized use.

Improper Use

Illustrates and describes incorrect operational practices to avoid, such as partial loading or using wrong equipment.

Safety Devices Features

Details the components, position, and function of various safety devices like mechanical anti-fall and photocells.

Residual Risks

Identifies hazards, responsible personnel, conditions, and associated risks during maintenance activities.

Stickers and Plates

Lists and describes the various identification labels and their meanings for safe operation.

Installation

Transport and Handling

Guidelines for safely transporting and handling the packaged lift equipment using cranes or forklifts.

Place of Installation

Requirements for the installation site, including free space, temperature, and foundation characteristics.

Connecting the Lift

Outlines the sequence of operations for connecting the lift's main components and control unit.

Hydraulic Connections

Step-by-step instructions for making the hydraulic hose connections to the control unit's hydraulic blocks.

Pneumatic Connections

Instructions for connecting the pneumatic hose from the control unit to the lift using a tee coupling.

Electric Connection

Requirements for the electrical supply system, including switches, fuses, and cable protection.

Filling the Circuit Master-Slave

Procedure for filling the hydraulic circuit and removing air during the installation phase.

Lift Position

Steps for correctly positioning and fixing the lift's base frames on the floor.

Check

Instructions for checking the gap and spring height as part of the installation process.

Anchor Bolt Installation

Detailed guide for drilling, installing anchor capsules, and tightening anchor rods for secure mounting.

Checks Before Use

A comprehensive checklist of tests and standards to perform before operating the lift.

Final Testing

Describes static and dynamic load tests with overloading factors for final verification.

Use

Operation Commands

Explains the function of various control panel buttons and switches for lift operation.

Maintenance

Ordinary / Extraordinary Maintenance

Recommended schedule and procedures for routine and periodic maintenance operations.

Maximum Pressure Valve Calibration

Procedure for calibrating the maximum pressure relief valve, to be done by authorized technicians.

Photocell

Instructions for aligning and testing photocell sensors for platform synchronization.

Velocity Fuse

Procedure for calibrating the velocity fuse valve, requiring manufacturer specifications.

Platform Levelling

Steps for leveling the lift platforms without a vehicle present, ensuring proper balance.

Unblocking Safety Locks

Procedure for unblocking safety locks when they are in a blocking position, by authorized technicians.

Eliminating Air from the Volumetric Circuit

Steps to remove air from the hydraulic circuit to ensure proper function and performance.

Safety Lowering

Manual procedure for safely lowering the lift platform in case of a power outage.

Abnormal Operation

Troubleshooting guide for common lift issues, listing problems, locations, and checks.

Accessories

Lighting System

Details the neon strip lighting system available as an accessory for standalone models.

Related product manuals