Cummins PCC2100
Installation Guide
1. Unpack the monitor, antenna and the data/power cable. The 25 pin
connector plugs onto the front of the OmniMetrix
®
Monitor. This
cable includes wires to power the monitor as well as wires for alarm
inputs, relay outputs and analog inputs. Take a moment to inspect
all components to verify there is no shipping damage.
2. Place the antenna on the roof of the generator and route the
antenna cable into the area of the generator control. The antenna
used for transmitting must be installed to provide a separation
distance of at least 20 cm from all persons and must not transmit
simultaneously with any other antenna transmitters. BE SURE to
provide a drip loop lower than the monitor to keep water from
running down the antenna cable into the monitor connection.
3. Attach the monitor via its magnetic feet, on top of the engine
controller or other appropriate location. Horizontal surfaces are
best, but the unit may be mounted vertically or even upside down if
necessary. Note: If mounted vertically, install the monitor with the
cables down to prevent water from entering the enclosure.
4. Route the data/power cable into the generator control enclosure.
5. Instructions for wiring the monitor can be found in the table on the
following page.
6. TB1 terminals 9, 11, 13, and 15 should be daisy-chained together
and connected to ground on TB1 Terminal 20 (If connections
already exist on these terminals, contact OmniMetrix Technical
Support before continuing installation).
7. Attach the antenna cable to the front of the monitor, and tighten
thumb tight.
8. Turn on the monitor and confirm that the LEDs light up and blink.
If not, check for power on the terminal strip. If, after 5 minutes, the
only LED lit is the Power LED, check the antenna mount and
cable connection.
9. Allow 15 minutes for the monitor to log into the network and then
call OmniMetrix at 770-209-0012 to confirm installation. Access to
machine data is through the OmniView
®
web interface at
www.omnimetrix.net. Contact OmniMetrix for login instructions
and web training.
Data/Power Cable
PCC2100 Controller
Terminal Block 1
Question and Answer IconNeed help?

Do you have a question about the OmniMetrix Cummins PCC2100 and is the answer not in the manual?

OmniMetrix Cummins PCC2100 Specifications

General IconGeneral
BrandOmniMetrix
ModelCummins PCC2100
CategoryController
LanguageEnglish

Summary

OmniMetrix Monitor Installation Procedure

Component Unpacking and Inspection

Unpack the monitor, antenna, and data/power cable, inspecting all components for shipping damage.

Antenna Placement and Cable Routing

Place antenna on generator roof, route cable with a drip loop, and ensure 20 cm separation from persons.

Monitor Mounting and Cable Management

Mount monitor using magnetic feet on a horizontal surface, routing cables downward if mounted vertically.

Wiring and Connection Guidelines

Route the data/power cable into the generator control enclosure and consult the wiring table for connections.

Power-Up and Initial Status Check

Turn on the monitor and verify that the LEDs light up and blink correctly.

Network Login and Installation Confirmation

Allow 15 minutes for network login, then call OmniMetrix to confirm successful installation.