Do you have a question about the OPW Petro Vend 100 and is the answer not in the manual?
Guidelines for using internal USB ports for data storage and system connection.
Explanation of DANGER, WARNING, CAUTION, and NOTICE symbols for safety.
Defines Class I, Division 1 and 2 hazardous area classifications per standards.
Details system adherence to Federal Communications Commission rules regarding interference.
Defines system terms and explains software version numbering for FIT/PCM and FSC.
Lists physical dimensions, operating temperature, and power requirements for the PV100®.
Describes how mechanical pumps are controlled using pulse inputs from dispensers.
Specifies compliance with electrical codes for conduit and wiring installations.
Details conduit sealing for hazardous areas and pedestal conduit termination and sealing.
Explains system grounding procedures and dedicated power supply needs.
Outlines requirements for pulser wire types and their installation.
Provides a guide to unpacking and initial setup of the PV100® system.
Installing conduits for power and PCM connections to dispenser pumps.
Connecting system power and wiring the PCM to dispenser units, including pulser.
Explains pulser wiring and PCM board configuration using DIP switches.
Describes steps to test the PCM board's functionality using the Manual Override feature.
Guides on reassembling the unit and installing the pedestal door.
Details on navigating menus for terminal settings and diagnostic tests.
Configuring display modes, testing keypad/readers, and setting system tones for user feedback.
Settings for network ID, miscellaneous tests, pump control, and software updates.
Accessing management features and configuring site-specific details.
Guides on setting up manager cards for accessing system management functions.
Covers configuring site ID, date/time, keyboard, and various operational options.
Provides guidelines for cleaning and maintaining system components.
Details on lubricating door locks and servicing card readers.
Describes checking heater functionality for optimal cold weather operation.
Presents an illustration and description of the PV100® primary board components.
Lists codes for authorization denials and provides corresponding solutions.
Offers a cross-referenced list of system menus and their page locations for easy navigation.
| Category | Control Systems |
|---|---|
| Manufacturer | OPW |
| Model | Petro Vend 100 |
| Operating Temperature | -40°C to 70°C |
| Enclosure Rating | NEMA 4X |
| Communication Protocol | RS-485 |
| Humidity Range | 0% to 95% non-condensing |