EasyManua.ls Logo

OPW Petro Vend 200 M1010 - User Manual

Default Icon
98 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
Part Number: M1010, Rev. 10
Issue Date: 7/22/2021
Supersedes: 4/27/2021
M1010 - Petro Vend
®
200
Fuel Control System
Installation Operation and Maintenance Guide

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the OPW Petro Vend 200 M1010 and is the answer not in the manual?

Summary

Section 1 PV200 Fuel Control System

1.1 Technical Specifications

Detailed specifications including dimensions, power requirements, operating temperature, and environmental conditions.

1.2 Safety Warnings

Explains DANGER, WARNING, CAUTION, and NOTICE alerts for safe operation and potential hazards.

1.3 Information Panels

Defines icons used for notes, important information, reminders, and tips within the manual.

1.4 Hazardous Areas

Details NEC classifications for hazardous locations and specific installation requirements.

1.4.1 NFPA;NEC - Class I, Div. 1 & Div. 2

Specifies Class I, Division 1 and 2 hazardous area definitions per National Electrical Code.

1.4.2 Installation Requirement

Outlines installation requirements relative to hazardous areas and pedestal placement.

1.5 FCC Compliance

States compliance with Federal Communications Commission rules and operating conditions.

Section 2 System Overview

Section 3 PV200 Installation

3.1 Pedestal and Enclosure Installation

Covers pedestal mounting, enclosure dimensions, and hole patterns for installation.

3.2 Aluminum Enclosure Conduit Knockouts

Details how to remove and seal knockout plugs in the PV200 enclosure.

3.3 Flex Conduit Installation

Instructions for installing flexible conduit from the rigid conduit to the enclosure.

3.4 Power and Communication Wiring

Guides on pulling wires and connecting power and communication to the terminal.

Section 4 Preparation of System Conduit & Wiring Requirements

4.1 Conduit;Wiring Requirements

Specifies NEC compliance, conduit types, and wire separation requirements.

4.1.1 Petro-Net Wiring

Details Petro-Net wiring specifications, including twisted-pair usage and ordering.

4.2 PV200 Power, Petro-Net

Outlines requirements for shared and separate conduits for power and communication.

4.2.1 Grounding

Explains grounding procedures for system safety and proper operation.

4.2.2 Circuit Breakers

Specifies requirements for dedicated circuit breakers for PV200 power supply.

Section 5 Complete the Installation

Section 6 Maintenance

Section 7 Receipt Printer

7.1 Receipt Printer Installation

Details the installation of the optional receipt printer and its components.

7.2 Load Receipt Printer Paper

Instructions on how to load thermal paper into the receipt printer.

7.3 Clear a Paper Jam

Procedures for clearing paper jams from the receipt printer.

Section 8 Antenna Installation

Section 9 Main Board

9.1 Main Board Connections

Identifies and describes the various connection points and ports on the main board.

9.2 Main Board LEDs

Explains the function and status indicated by the main board LEDs.

9.3 Main Board Jumpers

Details the configuration options available through main board jumpers.

Section 10 PV200 Terminal Setup

10.1 Screen Controls

Explains how to navigate and use the PV200 terminal setup screen interface.

10.2 Readers Menu

Describes the configuration options for various reader types within the terminal setup.

Section 11 Exploded View Drawings

11.1 PV200 Enclosure Assembly

Exploded view identifying parts of the PV200 enclosure.

11.2 PV200 Display

Exploded view identifying parts of the PV200 display assembly.

11.3 PV200 Pocket

Exploded view identifying parts for the PV200 pocket.

11.4 PV200 Door

Exploded view identifying parts for the PV200 door assembly.

11.5 Fastener Specifications

Lists fasteners used for different assemblies with part numbers and quantities.

11.6 Cables

Lists part numbers for various cables used with the PV200 system.

Appendix A - Software Upgrade Procedure

Appendix B - PV200 Options Installations

Alpha Keypad Installation

Instructions for installing the Alpha keypad as an optional upgrade.

ChipKey Reader Installation

Instructions for installing the ChipKey reader as an optional upgrade.

Magnetic Card Reader Installation

Instructions for installing the Magnetic Card Reader as an optional upgrade.

Dual Magnetic Card Reader Installation

Instructions for installing two Magnetic Card Readers as an optional upgrade.

Proximity Reader Installation

Instructions for installing the Proximity Reader as an optional upgrade.

AVI - PV200 Option Installation

Instructions for installing the AVI (Automatic Vehicle Identification) option.

DX Fleet Option

Details regarding the DX Fleet Option, including battery safety.

Modem and Gateway Installations

Instructions for installing internal modem and gateway options.

Drip Shield Kit Installation

Procedures for installing the drip shield kit for weather protection.

PV200 Door Gasket Kit Installation

Instructions for replacing rubber gaskets on the PV200 door.

Blank Option

Procedures for installing a blank plate to cover an open pocket slot.

Revisions

Warranty

OPW Petro Vend 200 M1010 Specifications

General IconGeneral
ModelPetro Vend 200 M1010
CategoryControl Systems
CompatibilityFuel Dispensers
Communication ProtocolRS-485
Operating Temperature-40°C to +70°C
CertificationsUL, CE
Humidity Range0-95% non-condensing

Related product manuals