3
When the power cords are connected, the SP initializes and the power supply LEDs illuminate. After a
few minutes, the SP login prompt displays on the terminal device. At this time, the host is not initialized or
powered on.
Power On the Server
The following section describes how to power on the host after installing the server.
1.
At the terminal device, log in to the SP as root with a password of changeme.
After a brief delay, the Oracle Integrated Lights Out Manager (Oracle ILOM) prompt (->) is displayed.
For optimal security, change the root password. For more information about administration tasks such as
changing passwords, adding accounts, and setting account privileges, refer to the SPARC T5 Series Servers
Administration Guide and the Oracle ILOM documentation at: http://www.oracle.com/goto/ilom/docs
By default, the SP is configured to use DHCP to obtain an IP address. If you plan to assign a static IP address
to the SP, refer to the SPARC T5-2 Server Installation Guide for instructions.
2.
Power on the server and redirect the host output to display on the serial terminal device.
-> start /System
Are you sure you want to start /System (y/n)? y
-> start /HOST/console
Are you sure you want to start /HOST/console (y/n)? y