EasyManuals Logo

Oracle X5-2 Safety And Compliance Guide

Oracle X5-2
62 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #14 background imageLoading...
Page #14 background image
10 Oracle Exadata Storage Server X5-2 Extreme Flash Safety and Compliance Guide January 2015
Mechanical Loading Mounting of the equipment in the rack should be such that a hazardous condition is
not achieved due to uneven mechanical loading.
Circuit Overloading Consideration should be given to the connection of the equipment to the supply
circuit and the effect that overloading of the circuits might have on overcurrent protection and supply
wiring. Appropriate consideration of equipment nameplate ratings should be used when addressing this
concern.
Reliable Earthing Reliable earthing of rack-mounted equipment should be maintained. Particular attention
should be given to supply connections other than direct connections to the branch circuit (for example, use
of power strips).
Caution Slide/rail mounted equipment must not be used as a shelf or workspace.
Rack System Warnings
The following warnings apply to Racks and Rack Mounted systems.
Caution For safety, equipment should always be loaded from the bottom up. That is, install the
equipment that will be mounted in the lowest part of the rack first, then the next higher systems, etc.
Caution To prevent the rack from tipping during equipment installation, the anti-tilt bar on the
rack must be deployed.
Caution To prevent extreme operating temperature within the rack insure that the maximum
temperature does not exceed the product’s ambient rated temperatures.
Caution To prevent extreme operating temperatures due to reduced airflow consideration should
be made to the amount of air flow that is required for a safe operation of the equipment.
Caution Take adequate precautions when moving a rack or library that contains rack-installed
equipment. The weight of some rack equipment may have altered the rack or library center of
gravity and could cause an overbalance/tip condition during a move.
Caution For tape libraries, ensure that the equipment to be installed in the rack has UL Listing,
CSA or C-UL Certification, and is CE marked.

Table of Contents

Other manuals for Oracle X5-2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Oracle X5-2 and is the answer not in the manual?

Oracle X5-2 Specifications

General IconGeneral
Number of Processors2
Cores per ProcessorUp to 18
Form Factor2U Rackmount
ProcessorIntel Xeon E5-2600 v3
MemoryUp to 768 GB DDR4
Power Supply1200W
Operating SystemOracle Linux, Oracle Solaris
Network4 x 10Gb Ethernet ports

Related product manuals