6. Close the circuit-breaker by pressing the close button
and check the status indicator.
Figure 5.38. Handle and close button detail
7. Verify that the cubicle is in closed position.
Figure 5.39. Closed position detail
IG-296-EN version 01; 12/03/2020
56
Recommended sequence of operations General instructions
cgmcosmos: Medium voltage cubicles with full insulation
in SF
6
gas up to 24 kV in accordance with IEC Standard