EasyManua.ls Logo

OVE NIKO 48 3492202 User Manual

OVE NIKO 48 3492202
30 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
PAGE 1
NIKO 48
INSTALLATION MANUAL | MANUEL D’INSTALLATION | MANUAL DE INSTALACIÓN
www.ovedecors.com | customerservice@ovedecors.com
Questions, problems, need help?
Call our customer service department at
1-866-839-2888, 9 a.m. - 5 p.m., EST, Monday - Friday
Questions, problèmes ou besoin d’aide?
Contactez notre service à la clientèle au
1-866-839-2888, du lundi au vendredi de 9 h à 17 h HNE.
Preguntas, problemas o necesita ayuda?
Llame a nuestro departamento de servicio al cliente al
1-866-839-2888, 9 am. – 5 pm., HDE, Lunes a Viernes.
An installation video guide can be found on our Youtube channel:
Un guide d’installation video est disponible sur notre chaîne Youtube:
Una guía de instalación de vídeo está disponible en nuestro canal de Youtube:
https://tinyurl.com/3y33u3dr
Satin Nickel / Satiné / Satinado: ITEM / ARTICLE / ARTÍCULO #3492202
Matt Black / Noir Mat / Negro Mate: ITEM / ARTICLE / ARTÍCULO #3492206

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the OVE NIKO 48 3492202 and is the answer not in the manual?

OVE NIKO 48 3492202 Specifications

General IconGeneral
Product TypeVanity
Mounting LocationFree-standing
Sink IncludedYes
Number of Sinks1
Vanity Top IncludedYes
Cabinet MaterialWood
Width (in)48
Model Number3492202
BrandOVE

Summary

Shower Dimensions

Product Dimensions Overview

Visual representation of shower dimensions with labeled measurements.

Wall-to-Wall Dimensions

Required Wall Spacing

Specifies minimum and maximum distances between wall tiles for installation.

Installation Structure Overview

Wall Structure and Measurements

Details recommended wall structure and key measurements for product installation.

Package Content

Included Components List

Visual list of all parts included in the shower package.

Part List

Detailed Parts Identification

Comprehensive list of all parts with descriptions, quantities, and codes.

Supplied Hardware List

Hardware Components

Visual list of all supplied hardware with labels and quantities.

Tools Required

Necessary Tools

List of tools needed for installation that are not supplied with the product.

Preparation

Door Opening Orientation

Instructions for setting up the door based on opening direction (left/right).

Shower Head Placement Guidance

Recommendation for shower head placement to reduce leaking risk.

Safety Information

Handling Precautions

Safety guidelines for handling tempered glass and product components.

Installation Safety

Safety instructions regarding level floor, local codes, and periodic checks.

Safety Notice

Warranty Voidance and Disclaimer

Warning that modifications void warranty and disclaimer of distributor liability.

Wall Track Installation

Positioning and Marking Wall Track

Instructions for placing, leveling, and marking the wall track.

Drilling and Anchoring

Steps for drilling pilot holes and installing wall anchors if needed.

Securing Wall Track

Final step to attach the wall track using screws.

Fixed Panel Installation

Bottom Seal Strip Installation

Attaching the bottom seal strip to the fixed panel base.

Inserting Fixed Panel into Wall Track

Placing the fixed panel into the wall track for alignment.

Attaching Support Bracket

Securing the support bracket to the fixed panel.

Important Safety Notice Before Continuing

Hinge Handling Safety

Critical safety information for handling spring-loaded hinges.

Shower Door Installation

Hinge Placement and Preparation

Proper positioning of soft close and regular hinges based on door side.

Installing Hinges on Fixed Panel

Attaching the first part of hinges to the fixed panel securely.

Securing Regular Hinge

Using tools to open and secure the regular hinge temporarily.

Shower Door Installation (continued)

Supporting Door Panel During Hinge Install

Using wood blocks to steady the door panel while installing hinges.

Aligning and Fastening Hinges

Aligning door panel hinge holes with frame hinges and tightening.

Removing Hinge Clasp Tool

Final step to remove the tool that held the hinges open.

Shower Door Installation (continued)

Trimming Bottom Seal Strip

Cutting excess parts from the door bottom seal strip lip.

Installing Bottom Seal Strip

Inserting the prepared seal strip into the door panel.

Installing Door Handle

Attaching the door handle to the panel.

Shower Door Installation (continued)

Installing Magnetic Strip

Inserting the magnetic strip onto the door panel.

Connecting Door and Wall Tracks

Joining the magnetic track with the wall track for door closure.

Leveling and Marking Wall Track

Closing the door to align and mark the wall track position.

Shower Door Installation (continued)

Positioning and Marking Wall Track (R)

Placing and marking the second wall track (R) on the wall.

Drilling and Anchoring Wall Track (R)

Drilling pilot holes and installing anchors for the second wall track.

Securing Wall Track (R)

Fastening the second wall track (R) with screws and anchors.

Clamp Installation

Disassembling and Preparing Clamp

Taking apart the clamp and preparing it for mounting.

Mounting Clamp onto Fixed Panel

Positioning the clamp, marking, and drilling for installation.

Securing and Completing Clamp Install

Fixing the clamp with screws and finalizing its installation.

Decorative Track Installation

Measuring for Decorative Track Length

Measuring the opening to determine the correct length for the decorative track.

Cutting Decorative Track to Size

Trimming the decorative track based on measured dimensions.

Decorative Track Installation (continued)

Inserting Decorative Track into Bracket

Sliding the decorative track into its support bracket.

Attaching Decorative Cap

Placing the decorative cap onto the end of the track.

Installing Vertical Seal Strip

Inserting the vertical seal strip into the door panel, trimming if needed.

Support Bar Installation

Mounting Anchors on Support Bar

Attaching anchors to the support bar before wall mounting.

Positioning Support Bar and Bracket

Placing the support bar and loosely attaching its bracket.

Marking Wall for Anchor Placement

Outlining the locations on the wall for the support bar anchors.

Support Bar Installation (continued)

Preparing Anchor Points on Wall

Removing the bar, marking anchor centers, and preparing drill points.

Drilling and Anchoring Support Bar

Drilling holes and installing anchors for the support bar.

Support Bar Installation (continued)

Reassembling Support Bar Components

Reattaching anchors and bracket to the support bar.

Securing Support Bar to Wall

Tightly fixing the support bar using hex screws and brackets.

Wall Track Fastening

Fastening Magnetic Track

Drilling and screwing the magnetic track to the wall track.

Fastening Fixed Panel Track to Wall

Drilling and screwing the fixed panel track to the wall.

Sealing

Applying Silicone Sealant

Applying clear silicone water sealant around fixed components.

Drying Time and Leak Prevention

Allowing 24 hours for silicone to dry to prevent leaks.

Maintenance and Care

Daily Cleaning Procedures

Recommended daily cleaning using a wet cloth and mild cleaner.

Bolt Tightening and Checks

Instructions for tightening support bolts and periodic checks.

Limited Product Warranty

Warranty Coverage and Exclusions

Details of warranty periods for different parts and what is excluded.

Claim Procedure and Limitations

How to make a claim and limitations on remedies and damages.

Related product manuals