2.10 Description of the display screens (option) 24
2.10.1 Boot screen 24
2.10.2 Standby/Idle screen 25
2.10.3 Authorization screen 25
2.10.4 Preparing to charge screen 26
2.10.5 Charging screen 26
2.10.6 Charging completed screen 27
2.10.7 Fault detected display messages 27
3 Safety 29
3.1 Liability 29
3.2 Required qualifications for the installation engineer 29
3.3 Personal protective equipment 29
3.4 FCC compliance statement 30
3.5 Industry Canada compliance statement 30
3.6 General safety instructions 31
3.7 Signs on the EVSE 31
3.8 Discard the EVSE or parts of the EVSE 32
3.9 Safety instructions for earthing 32
3.10 Special safety instructions (IEC portfolio) 32
3.10.1 Safety instructions during installation 32
3.11 Special safety instructions (UL portfolio) 33
4 Installation 34
4.1 General installation procedure 34
4.2 Unpack the EVSE 34
5 Site preparation 35
5.1 Select the site 35
5.2 Prepare the site (IEC portfolio) 35
6 Mechanical installation 37
6.1 General mechanical installation procedure 37
6.2 Prepare the holes for the mounting screws 37
6.3 Install the upper mounting screws 38
6.4 Install the EVSE on the wall 38