EasyManua.ls Logo

Panasonic CS-A12CKP

Panasonic CS-A12CKP
90 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
(Gas leakage)
1.
Confirm that both the 2-way and 3-way valves are set to
the open position.
2.
Connect the charge set to the 3-way valves service
port.
Leave the valve on the charge set closed.
Connect the charge hose with the push pin to the
service port.
3.
Open the valves (Low side) on the charge set and
discharge the refrigerant until the gauge indicates 0.5
to 1 kg/cm
2
G (0.05 to 0.1 MPa) .
If there is no air in the refrigeration cycle [the pressure
when the air conditioner is not running is higher than 1
kg/cm
2
G (0.1 MPa)], discharge the refrigerant until the
gauge indicates 0.5 to 1 kg/cm
2
G (0.05 to 0.1 MPa). If
this is the case, it will not be necessary to apply a
evacuation.
Discharge the refrigerant gradually; if it is discharged
too suddenly, the refrigeration oil will be discharged.
11.2.4. Balance refrigerant of the 2-way, 3-way valves
Procedure:
64
CS-A7CKP CU-A7CKP5 / CS-A9CKP CU-A9CKP5 / CS-A12CKP CU-A12CKP5

Other manuals for Panasonic CS-A12CKP

Related product manuals