8.2.3.6. Deice Control
A. Deice operation (Normal Deice Operation)
1. Detection methods
Outdoor heat exchanger temperature sensor, timer.
2. Deice operation time chart
Notes
•
During deice operation, as relationship for outdoor piping temperature and time T5, the priority given to the condition
which is first fulfilled and shift to the next mode.
•
First deice after operation restricted to 60 min. & above.
•
No restart operation if compressor OFF for sequence No. 1~7.
(Instantaneous, restart)
Outdoor heat exchanger temperature
a 15°C
b 18°C
c 25°C
38
CS-E24CKE CU-E24CKE