EasyManua.ls Logo

Panasonic CT-110MA - Page 10

Panasonic CT-110MA
22 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
-UOMA/HOMCA
Figure
11
B.
WITH
TEST
EQUIPMENT
When
measuring
voltage
with
a
VTVM,
be
sure
to
use
the
test
points
located
at
the
conductor
side
of
the
circuit
boards.
Use
an
isolation
transformer
for
these.
CONVERGENCE
ADJUSTMENT
Note:
Before
any
convergence
adjustments
are
made
vertical
neight
and
focus
adjustment
must
be
completed.
1.
Use
3
dot
pattern
to
complete
this
adjustment.
2.
The
brightness
level
should
be
no
higher
than
necessary
to
obtain
a
clear
pattern.
3.
Loosen
the
convergence
magnet
clamp
and
converge
the
red
and
blue
dots
at
the
center
of
the
screen,
by
rotating
the
R-8
Static
Convergence
Magnet.
(See
figure
7.)
4.
Align
the
converged
red/blue
dots
with
the
green
dots
at
the
center
of
the
screen,
by
rotating
the
(RB)-G
Static
Convergence
Magnet.
(See
figure
7.)
5.
Tighten
the
convergence
magnet
clamp.
6.
Remove
the
DY
wedges
(see
figure
7)
and
slightly
tilt
(do
not
rotate)
the
deflection
yoke
horizontally
and
vertically
to
obtain
good
overall
convergence.
7.
Secure
the
deflection
yoke
by
reinserting
the
wedges.
(See
figure
11.)
8.
If
purity
error
is
found,
repeat
the
purity
adjustments.
NOTE
1.
Wedge
A
shown
in
figure
11
should
be
fixed
within
a
range
of
30°
to
the
left
of
the
vertical
line
as
shown
2.
After
inserting
wedge
A,
insert
wedges
B
and
C.
The
wedges
should
be
set
120°
apart
from
each
other.
3
Be
certain
that
the
three
wedges
are
firmly
fixed
and
the
Deflection
Yoke
is
tightly
clamped
in
place.
Otherwise
the
Deflection
Yoke
may
shift
its
position
and
cause
a
loss
of
convergence
and
purity.
POWER
LINE
VOLTAGE
(116V)
ADJUSTMENT
1.
Connect
a
voltmeter
between
TP91
and
ground.
2.
Adjust
R809
to
obtain
a
reading
of
116.0
V
±
0.5
V.
HIGH
VOLTAGE
ADJUSTMENT
1.
Adjust
color
temperature.
(See
color
temperature
adjust
ment.)
2.
Slide
the
Service
Switch
to
the
Service
position.
3.
Use
an
electrostatic
type
high
voltage
meter
to
confirm
that
the
high
voltage
is
within
the
range
of
24.0
kV
±
1.0
kV.
4.
If
the
high
voltage
is
out
of
tolerance,
adjust
R809
until
the
high
voltage
is
within
tolerance
without
over
or
under
going
B+
voltage
tolerance.
Note:
Be
cartain
that
B+
is
116.0
V
±
0.5
V
with
beam
current
at
zero
during
the
High
Voltage
Adjust
ment.
ABL
ALIGNMENT
This
is
factory
aligned.
Usually
no
further
alignment
is
required
in
the
field.
However,
when
the
A-Board,
or
CRT
is
replaced,
the
following
alignment
is
necessary.
1.
Set
the
monitor
to
receive
a
cross
hatch
pattern
from
a
video
signal
generator
2.
Set
Bright
and
Panabrite
controls
at
each
click
position.
3.
Connect
the
DC
voltmeter
between
TP86
and
TP87
(positive
lead
of
the
voltmeter
to
TP87
and
negative
lead
to
TP86.)
4.
Adjust
the
ABL
control
(R313)
to
obtain
a
voltmeter
reading
of
6.0
V
±
0.2
V.
8

Related product manuals