Items
Adjustment
Point
Procedure*
(B) VBACK Status
Confirmation
-
1. Confirm that the voltage between TP18 and GND is 0V ± 0.4V.
(C) BBIC
Confirmation
-
1. BBIC Confirmation (Execute the command "getchk").
2. Confirm the returned checksum value.
Connection of checksum value and program number is shown
below.
(D) Charge Control
Check & Charge
Current Monitor
Confirmation
-
1. Apply 6V between TP20(+) and TP21(-) with current limit of PSU to 250mA.
2. Confirm that the charge current is ON/OFF.
3. SW to decrease current limit of PSU to 100mA.
4. Confirm that the charge current is stable.
(E)
*
Charge Detection
(OFF)
Confirmation
-
1. Stop supplying 6V to TP20(+) and TP21(-).
2. Execute the command "charge".
3. Confirm that the returned value is 0x00 (hex).
(F)
*
Battery Monitor
Confirmation &
Adjustment
(Important)
-
1. Apply 2.3V ± 0.005V between TP3(+) and TP4(-).
2. Execute the command "readbatt".
3. Confirm:
98 < returned value < A8 (Hex)
4. Execute the command "WRTBAT2 XX".
XX: (returned value) - 06 (Hex)
44