EasyManua.ls Logo

Panasonic Quasar Omnivision PVQ-1311

Panasonic Quasar Omnivision PVQ-1311
247 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2. Removal of CRT Unit
Place the Unit face down on a soft cloth before removing the CRT
Unit.
3. Installation of VCR Chassis Unit
When installing 2 Screws (S-5), slide the Holder Unit of the
Cassette Up Assy (Refer to "METHOD FOR LOADING/
UNLOADING OF MECHANISM" in Service Notes) to tighten
screws. Then, slide it back to the EJECT Position.
Make sure that Mechanism and Cassette Up Assy are in the EJECT
Position. (Refer to "EJECT Position Confirmation" in
DISASSEMBLY/ASSEMBLY PROCEDURES.)
4. Removal of TV/VCR Main C.B.A.
Work carefully so as not to break Sensor LED when lifting the
Mechanism Chassis and Cassette Up Assy.
Installation of Mechanism Chassis and Cassette Up Assy onto TV/
VCR Main C.B.A.
A. Make sure the Mode Select SW. on the TV/VCR Main C.B.A. is in
EJECT position. If not, rotate the Mode Select SW. until the
alignment projection is in the EJECT Position.
B. Make sure the Mechanism and Cassette Up Assy are in the
EJECT Position. (Refer to "EJECT Position Confirmation" in
DISASSEMBLY/ASSEMBLY PROCEDURES.)
Fig. D7
29

Related product manuals