EasyManua.ls Logo

Panasonic S-50PY3E - Page 87

Panasonic S-50PY3E
89 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
87
9. TEST RUN WHEN CONNECT TO RAC MULTI OUTDOOR
9-1. Precautions
Request that the customer be present when the test run is performed.
At this time, explain the operation manual and have the customer perform the actual steps.
Check that the 230 VAC power is not connected to the inter-unit control wiring connector
terminal.
* If 230 VAC is accidentally applied, the indoor unit control PCB fuse will blow in order to
protect the PCB.
In this case, make the wiring correctly.
Then disconnect the 2P connectors (OC) that are connected to the indoor unit control PCB,
and replace them with 2P connectors (EMG).
If operation is still not possible after changing the brown connectors, cut the jumper on the
indoor unit control PCB.
(Be sure to turn the power OFF before performing this work.)
9-2. Test Run Procedure
Recheck the items to check before the test run.
(See Section 9-3.)
Address Setting
RAC MULTI CONNECTION
(See Section 9-6’, 9-7)
(See Section 9-10.)
Can
operation be
started?
Set the remote controller to “Test run”.
Return the remote controller to normal control.
NO
YES
NOTE
Check the indoor-side drainage.
OC
(CN040, blue)
Jumper
(JP040)
EMG
(CN044, brown)
See “Contents of Remote Controller Switch
Alarm Display” to check the system.
Regarding the alarm contents, see the
SUPPLEMENT at the end of this manual.
01_330918_EU_Eng.indb 87 2021/9/9 11:27:08

Table of Contents

Other manuals for Panasonic S-50PY3E

Related product manuals