EasyManua.ls Logo

PELLET PRO 2300 - Internal Fitments and Final Assembly; Handle Attachment and Internal Guards; Vent, Dampener, and Rack Installation

PELLET PRO 2300
4 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10.
Remove the bolts and washers that are attached to the door handle and side handle. Using the separate longer bolts
and washers provided, attach the door handle and side handle to the cabinet.
11.
Install the Heat Diffuser, Drip Pan, and Hopper Safety Guard as shown below.
12) Attach the side vent and dampener as shown using the (6) bolts that are already
threaded into the side wall.
13) Install all four stainless steel racks
14) Wipe down the racks and inside of the smoker with vegetable oil to season it.
**The Caution sticker on the hopper assembly can be removed if desired.**