MicroBrite Color and White Light Installation and User’s Guide MicroBrite Color and White Light Installation and User’s Guide
12
The following removal and installation instructions describe how to remove and install the
MicroBrite
light assembly.
1. Switch off electrical switch or circuit breaker at the source,
2. Remove Junction Box or Transformer cover. Disconnect the light wires and
attach a fish tape to the existing light power cord. This will assist in pulling the
replacement light power cord through the conduit back to the junction box.
3. Remove the MicroBrite light assembly from the pool or spa water: Using
the provided installation tool (P/N 602158), rotate the light assembly counter-
clockwise 1/8 of a turn to release the light from the wall fitting.
4. Slowly pull the light and attached power cord (with attached fish tape) out of
the wall fitting. Pull the light’s power cord and fish tape out of the wall fitting and
place the light on the deck.
5. Attach the new light power cord to the fish tape and carefully feed the fish tape
and cable to the junction box.
6. Install the light into the wall fitting: See page 6 and 9 for light installation
instructions.
7. Connect the two (2) conductors to the corresponding circuit wires in the
Junction Box: See page 10 for light wiring instructions.
8. Final check: See page 10 for final check instructions.
Failure to bring the pool or spa’s electrical system up to code requirements before
installing the underwater light will create an electrical hazard which could result in
death or serious injury to pool users, installers, or others due to electrical shock, and
may also cause damage to property.
IMPORTANT NOTICE: THE MICROBRITE LIGHT IS A
NON-SERVICEABLE LIGHT. THE COMPLETE LIGHT ASSEMBLY
MUST BE REPLACED.
IMPORTANT NOTICE: THE MICROBRITE
COLOR AND WHITE LED
LIGHT IS A NON-SERVICEABLE LIGHT. THE COMPLETE
LIGHT ASSEMBLY MUST BE REPLACED.
1. Pentair automation Control System: Unlatch the enclosure door spring
latch, and open the door.
2. Discharge Electrostatic energy before removing the cover by first
touching the metal part of the enclosure.
3. Loosen the two (2) retaining screws from the HIGH VOLTAGE FRONT PANEL.
Remove the panel from the enclosure.
4. Run the MicroBrite light power cord to the transformer which is attached to
the auxiliary relay in the load center.
5. Connect the 120 VAC side of a 12 VAC transformer to the LOAD SIDE of one
of the auxiliary (AUX) relays in the load center.
6. Connect the Neutral conductor from the 12 VAC transformer to the Neutral
bus bar in the load center.
7. After the connection has been completed, close the control panel and secure
it with the two (2) retaining screws.
8. Close the load center front door. Fasten the spring latch.