3)7*67$1'$5' 86$
6HWWLQJXSWKHPDFKLQH
BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
________________________________________________________________________________________
12. Turn the red pressure switch "OFF" (machine stops).
13. Couple air hose to air manifold and spraying gun and open air tap at spraying
gun.
14. Switch on the compressor.
15. Connect all the necessary mortar hoses together (making sure that the seals are
clean and intact), and flush with water to avoid blockages (do not leave water in
the hoses). Use connecting piece (in tool kit). See sheet 3 01 00 422 →
Measures at the end of a work and by cleaning. Approx. 3 litres of smooth-lowing
lime or plaster mixture into the first hose after the machine.