EasyManua.ls Logo

Pilatus PC-12 - Page 75

Pilatus PC-12
94 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
After the aircraft has been washed, if the applicable equipment and supplies are available, it
is recommended to lubricate the Main Landing Gear (MLG) and Nose Landing Gear (NLG) as
follows:
1 Lubricate the MLG with an applicable grease gun and grease at the two fittings
Figure 2-5-1 [1] and Figure 2-5-1 [2].
2 Lubricate the NLG with an applicable grease gun and grease at the five fittings
Figure 2-5-2 [1], Figure 2-5-2 [2], Figure 2-5-2 [3], Figure 2-5-2 [4], and Figure 2-5-2 [5].
If the applicable equipment is not available, it is recommended to lubricate the MLG and NLG
on return to your service centre. Refer to the Aircraft Maintenance Manual.
Section 2 - Aircraft Servicing
Ground Servicing Guide Report No: 02527
Issue date: Dec 19, 2022
Page 2-5-5
12-A-A15-20-0807-02A-254A-A

Table of Contents

Other manuals for Pilatus PC-12

Related product manuals