Remarks: The materials required for installing the head are all in the carriage sealing pocket,
except for the head. Common tools are provided by the user.
4.3.2 Installation steps of head.
1) Installation of the flat line of the head: insert the 14P flat line into the head according to
the mark, pay attention to the mark of the flat line, and insert it on the upper and lower
interfaces of the nozzle accordingly to prevent the flat line from being inserted reversely,
as shown in Figure 1 below.
2) Attach stickers to the connection between the head and the data cable: use scissors
to cut the stickers according to the red line identification, and use the cut stickers to
protect the lower and upper parts of the slot of the flat line of the head to prevent the
splashed ink from entering the slot, causing the nozzle to be short circuited and burned,
as shown in Figure 2 and Figure 3 below