No Diving or Jumping. Observe all Safety Rules.
1-15
j. Carefullydig
outeachpatio
stonetrench.
Measurefrom
thecentreline
paintedon
theground
andtheline
betweenthe
stakes.
Donot dig
thetrenches
toolargeor
toodeep;the
groundaround
theedgesof
eacthtrench
must remain
rmandun-
disturbed.
k. Temporarilyreplacethestrings
removedinstep(i)tocheckthatthe
trenchesareexactlyparallel.Remove
thestringsagainwhenyouaren-
ished.
l. Spreadalayerofcrushedlimestone
(orequivalent)1"(25mm)thickinto
thebottomoftheofeachtrench.Pack
rmly.
m.Placeaconcretepatiostone12"x12"
squarex2"thick(30x30x5cm)
intoeachtrench,ontopofthelime-
stonelayer.Makesureitisleveland
positionedcorrectly.
n. Fillthetrenchesinwithstabilizer(orequivalent).Fillthem
uptothetopedgesofthepatiostones.Sprayitwithsome
watertohelpwiththecompaction.Standonthepatiostone
andtampdownthestabilizeruntilasolidbaseisachieved
(standingonthepatiostonehelpspreventthestonefrommov-
ing).Donottamptoohardorthepatiostonewillmove.
o. Recheckthedistancesbetweenthepatiostoneandmakeanyadjustmentsyouneedto
makesurethespacingisexactlyright.Refertopage1-10,Step6formeasurements.
• Seethedrawingonthenextpageforanoverviewofallthepartsusedto
install the buttresses, uprights and base rails.
26
27
28
Caution:
Makesurethereis
adequatedrainageinthe
bottomofeachtrench
andalongthesidesof
thepoolarea.There
mustbeadequatedrain-
ageforasafeandsecure
poolfoundation.
29
Hint:
Stabilizerorequivalent
mustbeusedtobackll
thepatiostonetrenches.