EasyManua.ls Logo

Potterton Promax Ultra Combi 24 User Manual

Potterton Promax Ultra Combi 24
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
P
Promax Ultra Combi
Installation and Service Manual
Condensing Combination Boiler
24 - 28 - 33 - 40
en
United Kingdom
These instructions include the Benchmark Commissioning Checklist
and should be left with the user for safe keeping.
Question and Answer IconNeed help?

Do you have a question about the Potterton Promax Ultra Combi 24 and is the answer not in the manual?

Potterton Promax Ultra Combi 24 Specifications

General IconGeneral
BrandPotterton
ModelPromax Ultra Combi 24
CategoryBoiler
LanguageEnglish

Summary

Potterton Promax Ultra Combi Installation and Service Manual

Installer Notification Guidelines

Legislation

Installation, Commissioning, Service & Repair Requirements

Details mandatory requirements for installing, commissioning, and servicing the appliance.

Safe Manual Handling

Technical Data and Specifications

Promax Ultra Combi Model Technical Data

Detailed technical parameters including electrical, heat output, flow rates, and weights.

Dimensions and Fixings

System Details and Requirements

System Filling and Pressurising Procedure

Instructions for filling and pressurising the central heating system.

Safety Pressure Relief Valve Installation

Guidance on installing the pressure relief valve and discharge pipe.

Domestic Hot Water Circuit Requirements

Covers installation requirements for the DHW circuit and mains pressure.

Site Requirements and Location

Gas Supply Installation Standards

Covers the requirements for gas supply installation in GB and IE, including pipe size.

Electrical Supply and Connection

Details the electrical supply requirements and isolation methods for the boiler.

Condensate Drain Installation

Provides detailed guidelines for installing the condensate drain pipework to prevent freezing and blockages.

Flue Terminal Siting Requirements

Details regulations for positioning flue terminals to ensure safe dispersal of combustion products.

Flue System Options

Horizontal Flue System Installation

Guidelines for installing horizontal flue systems, including maximum lengths and support.

Boiler Installation Procedures

Mounting the Boiler

Instructions for lifting and securing the boiler onto the wall plate.

Connecting the Condensate Drain

Instructions for connecting the condensate trap outlet to the drainage system.

Fitting the Horizontal Telescopic Flue

Step-by-step guide for assembling and fitting the telescopic flue sections.

Making Electrical Connections

Details how to connect the mains supply and external controls to the boiler's terminal strip.

Boiler Commissioning Procedures

Boiler Commissioning Steps

Details initial commissioning steps including system filling, gas checks, and de-aeration.

Checking Gas Inlet Pressure and Rate

Details how to measure operational gas pressure and gas rate for correct boiler operation.

Completion and System Draining

Boiler Servicing and Maintenance

Annual Servicing: Performance and Safety Checks

Details the essential checks required during annual servicing for safety and performance.

Changing Boiler Components

Replacing the PCB and R.D.S.

Guidance on replacing the printed circuit board and removable data stick.

Replacing the Gas Valve

Instructions for replacing the gas valve, including calibration requirements.

Combustion Analysis and Calibration

Checking Boiler Combustion

Details the procedure for checking combustion ratios (CO/CO2) at different rates.

Adjusting CO2 Levels

Instructions on how to adjust the CO2 levels for optimal combustion.

Boiler Calibration Function

Explains how to activate and use the boiler's automatic calibration function.

Electrical Wiring Diagram

Troubleshooting and Fault Finding

Initial Fault Finding Checks

Basic checks to perform when troubleshooting boiler issues, including supply checks.

Understanding Boiler Error Codes

Explains the meaning of various error codes displayed by the boiler.

External Low Voltage Controls

Connecting the 7 Day Wired Sensor

Instructions for wiring the 7-day wired sensor to the boiler.

Connecting Wireless Sensors

Instructions for connecting the 7-day wireless and 24-hour wireless sensor receivers.

Gas Boiler System Commissioning Checklist