EasyManua.ls Logo

Powernail 50F - Loading the Fasteners

Powernail 50F
12 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
LOADING THE FASTENERS
1. Insert a full stick of 1-1/4”, 1-1/2”
or 1-3/4” 18 gauge Powercleats
through the slotted Magazine Rear
Cover(49) into the Magazine (47)
OPERATION, continued...
Figure 5.
Figure 6.
2. Pull back the spring loaded Nail Pusher (39) over
the nails until it contacts the last nail and slowly
release the Nail Pusher. The nailer is now loaded.

Related product manuals