EasyManua.ls Logo

Premier 200 User Manual

Premier 200
8 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
IMPORTANT
Read these instructions completely before installing, using or
attempting to repair this product. If you have any questions,
call Premier at (800) 255-5387 or (503) 234-9202.
Installation, Inspection, Operation
& Maintenance Guide
MANUFACTURING CO.
THE FIRST NAME IN QUALITY COUPLINGS
200 / 200L / 300
Bolt-On Drawbar Eyes
Question and Answer IconNeed help?

Do you have a question about the Premier 200 and is the answer not in the manual?

Premier 200 Specifications

General IconGeneral
ModelPremier 200
Power SourceElectric
Frequency50 Hz
MaterialSteel
Operating Temperature40°C
Voltage230V

Summary

Selecting the Right Equipment

Steps for Selecting Drawbar Eyes

Outlines the four-step process for selecting appropriate Premier couplings and drawbar eyes.

Determining Gross Trailer Weight

Guidance on calculating the Gross Trailer Weight (GVWR) for equipment selection.

Determining Tongue Weight Capacity

Explains how to determine the maximum expected weight at the drawbar eye.

Considering Operating Conditions

Addresses how environment and operating practices influence safety margin selection.

Understanding Premier Load Specifications

Premier Load Specification Definitions

Defines key load specifications like Gross Trailer Weight and Tongue Weight.

Importance of Inspection and Maintenance

Highlights the critical role of regular inspection and maintenance for product longevity and safety.

Coupling to Drawbar Eye Cross Reference

Cross Reference Chart

Provides a chart for matching Premier couplings with compatible drawbar eye models.

200 / 200L / 300 Drawbar Eyes Specifications

200 Standard Installation Drawing

Presents the installation drawing and dimensions for the 200 model drawbar eye.

200L Standard Installation Drawing

Presents the installation drawing and dimensions for the 200L model drawbar eye.

300 Standard Installation Drawing

Presents the installation drawing and dimensions for the 300 model drawbar eye.

Installation, Operation & Maintenance

Installation Procedure

Step-by-step instructions for correctly installing the drawbar eyes.

Inspection, Operation, and Maintenance

Guidelines for inspecting, operating, and maintaining the drawbar eyes.

Important Guidelines for Drawbar Eyes

Crucial guidelines applicable to all Premier Bolt-On Drawbar Eyes for safe usage.

ATTENTION! Safety Instructions

Distributor and OEM Responsibilities

Specific instructions for distributors and OEMs to inform their customers.

Product Warranty and Disclaimer

Disclaimer

States the company's right to alter information and product specifications.

Related product manuals