EasyManua.ls Logo

Premier Floors - Page 27

Premier Floors
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
27
Another option: Once the top plate is in, you
may now also hang joists directly from the wall
panel. Use a joist hanger with a nailable top
flange. The flange should bear at least 1.5” (2”
is best) on to the top plate. Nail the top flange
following the fastening schedule specified by
the engineer.
As always, consult with your engineer of record
concerning your specific design requirements.