EasyManua.ls Logo

Premier Floors - Page 5

Premier Floors
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5
• Make sure to drill the top and bottom
plates for the vertical electrical chases in
the wall panels.
• Do not put plumbing inside SIPs.
• Do not cut the skins (OSB) for extra
electrical chases or plumbing.
• Do not pick up the SIPs by the edge of the
top skin.
• Remove debris from sill plate before you
place the SIP wall panel on it.
• Use mastic on all connections as shown in
the PBS details.
• Make sure that both of the wall SIPs skins
are bearing on the floor.
• Follow proper nailing requirements according
to details and job specific engineering.
• Plumb each SIP in each direction, then secure
with nails.
• Fill all voids with expanding foam.
• Do not apply interior or exterior materials
over wet SIPs.