EasyManua.ls Logo

Primal PSPR0020 - Page 9

Primal PSPR0020
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ASSEMBLY DIAGRAM 2 USE A PARTNER TO HELP WITH THIS STEP
REMEMBER: Only hand tighten all nuts and bolts until whole machine is assembled
1.
Attach CONNECTPLATE(3) to RIGHT&LEFTBASE(1&2) withBOLTM12*95 (128), WASHER
12(134)andLOCKNUTM12(138).
2.
AttachRAERBASEA (20)toRIGHT&LEFTBASE(1&2)withBOLTM12*95(128),WASHER12
(134)andLOCKNUTM12(138).
3.
AttachRAERBASEB(21)toRAERBASEA(20)withBOLTM12*95(128),WASHER12(134)
andLOCKNUTM12(138).
4.
AttachREARUPRIGH(23)toRAERBASEA(20)withSCREWM12*95(109),WASHER12(134)
andLOCKNUTM12(138).
5.
Attach GUIDE ROD (10) to RAER BASE B (21) with SCREW M10*85 (108) and RUBBER
BUFFER(76).
6.
(See the exploded diagram for more detail.)
AttachALUMINUMWHEEL(146)to FOAMSUPPORT
(25)withBOLTM10*100(120),WASHER10(133)andLOCKNUTM10(137).
7.
Attach ROUND TUBE (30) to FOAM SUPPORT (25)with BOLT M10*100 (120), WASHER 10
(133)andLOCKNUTM10(137).
8.
Attach FOAMSUPPORT(25)toRAERBASEA&RAERBASEB(20&21)with SCREWM12*95
(109),WASHER12(134)andLOCKNUTM12(138).